Methods


our method of treatment consists of chemical treatment of the following areas:

  • The soil around the foundation of your building (External Treatment).
  • The base of the masonry walls (Internal Treatment).
  • All vulnerable wooden portions of the building.

Soil(External Treatment)

A chemical toxic barrier is created between the termites in the soil and the building that has to be protected. This is achieved in the following manner:
If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300mm (1ft) apart from each other. Insecticide is then poured, so that it reaches the soil to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
If there is loose earth around the walls of your building, trenches of a 'shovel width' are dug, exposing the external surfaces of the foundation wall up to a depth of 500 mm from the ground level. While re-filling the trenches, the dug up earth is returned in layers & insecticide is sprayed over the back fill earth.

The Base of the Masonry Walls (Internal Treatment)

The internal treatment of base of masonry walls and treatment of woodwork is carried out as per the one-year maintenance contract mentioned above. Termites, which originate from the soil, are controlled effectively when your building is treated at the ground level as per the above mentioned method.
But, as an additional precaution, the outer walls on the first floor are also subjected to the masonry drilling treatment. Above the first floor, the drilling operation is carried out only in areas infested by termites.

The Base of the Masonry Walls (Internal Treatment)

The internal treatment of base of masonry walls and treatment of woodwork is carried out as per the one-year maintenance contract mentioned above. Termites, which originate from the soil, are controlled effectively when your building is treated at the ground level as per the above mentioned method.
But, as an additional precaution, the outer walls on the first floor are also subjected to the masonry drilling treatment. Above the first floor, the drilling operation is carried out only in areas infested by termites.

Vulnerable Wooden Portions of the Building:

Further, on all floors, wood work like doors and windows, which are highly susceptible to termite attack are also protected by treating them with the drilling operation. Spot treatment of spraying on infested areas in the walls and ceiling is also carried out. On completion of the initial treatment, about 80% of the termites are eliminated from your building. The remaining which is hidden in the walls is eliminated within 6 months, during the check up visits of our operator. In remote cases, it may even take 2 years to eradicate the termites.

Warranty

Warranty: 10 Years - In case of comprehensive anti-termite treatment of the entire building.